Why Global Trade Customers Choose Us: The Advantages of Our Stainless Steel Sink Manufacturer
In the highly competitive global market, choosing a reliable stainless steel sink manufacturer is crucial. As an ISO-certified factory with a 30,000 square meter production base, we offer direct pricing and a guaranteed 45-day delivery time. Our unbeatable formula is “Manufacturer Direct x Online Service,” ensuring customers receive the best products and service experience.

Core Advantages Comparison
Competitive Advantage | Industry Average | Us |
---|---|---|
MOQ Flexibility | 500 pcs | Accept 50 pcs |
Price | Government Importer +35% | Factory Direct 0% |
Customization Response Time | 21 days | 72 hours |
Quality Inspection Standards | ISO 9001 | ISO 9001 + IATF 16949 |
About Our Manufacturing
1.1 Equipment Systems
Our production equipment and systems ensure high precision and quality for every product:
- Trumpf 6kW Laser Cutter (Precision ±0.05mm)
- Schuler 800T Hydraulic System (EU Machinery Directive Certified)
- ABB Welding Robots (6-axis repeatability accuracy 0.02mm)
Capacity Data:
- Monthly Capacity: 250,000 units
- Maximum Daily Output: 12,000 units
- Die Library: Over 1,200 sets (Supports non-standard immediate production)
1.2 High-Quality Quality Inspection and Control
Our rigorous quality control processes include:
- Raw Material Spectroscopy Testing (PMI Authenticity Certification)
- Laser Cutting Quality Inspection
- Real-time Lifting Monitoring
- 48-hour Salt Spray Accelerated Corrosion Test
- Full Dimensional Quality Inspection Before Shipment
- Container Fixed Packaging
Product Customization

2.1 Rapid Custom Production in 3-5 Days
Our efficient and precise customization process includes the following steps:
- Customer uploads CAD drawings
- Confirm process details
- Quotation
- Production preparation
- Laser cutting
- Punching and forming
- Welding
- Surface treatment
2.2 Material Integration Capabilities
We not only strictly control the quality of stainless steel raw materials during production but also procure and test high-quality durable components to ensure the superior performance of the final product.
Chapter 3: Logistics and Transportation Services
3.1 Global Delivery Network
Our extensive global logistics network ensures fast and safe delivery of products to customers worldwide:
- Europe: Rotterdam/Hamburg – 35 days by sea; Central European Rail 18 days
- North America: Los Angeles/New York – 28 days by sea, air freight 5 days for stock preparation
- Southeast Asia: Singapore/Klang – 15 days by sea, multimodal transport 10 days
Global Success Stories
Case Study 1: European Chain Hotel Group
Challenge: Standardizing across 3,000+ rooms in 28 countries. Solution:
- Carefully designed to reduce installation costs by 37%
- PVD Rose Gold Coating certified by REACH Outcome: Zero quality complaints, 300% increase in second-phase orders
Case Study 2: North American High-End Cabinet Brand OEM
Requirement: 2,000 custom-sized units per week with brand packaging. Response:
- Established dedicated production lines (Just-In-Time delivery)
- Developed fingerprint-resistant nano-coating technology Outcome: Customer retail price premium reached 65%
Get a Quote
If you are interested in our products or have any questions, please feel free to contact us:
- 📧 Email: pftmetal@163.com
- 🌐 WhatsApp: +86 18923260867
- 📞 24/7 Hotline: +86 18923260867

Conclusion
Choosing us as your stainless steel sink supplier will provide you with the following advantages:
- Flexibility: Accept small batch orders to meet diverse needs.
- Competitive Pricing: Factory-direct pricing with no middleman markup.
- Rapid Response: 72-hour response time for customization requests.
- High-Quality Standards: Dual ISO certification ensures product quality.
- Global Logistics Network: Fast and secure delivery to locations around the world.
Whether you are a large chain hotel group or a high-end cabinet brand, we can provide you with top-quality stainless steel sinks. We look forward to working with you to create greater value together!
One Comment
Comments are closed.